Load Assurance Ideas

Idea and discussion portal for the Load Assurance product line. Users may submit, view and vote on ideas submitted by all users.

Prompt Drivers to Add Products to Ticket When Slump Increases Without Water Usage

When the probe detects a significant increase in slump without seeing any pulses from the flow meter, send a prompt to the tablet asking the driver if any water reducer was added to the load. This would help us bill properly for products used on site.

  • Andrew Thompson
  • Feb 3 2023
  • Attach files